Construction at Wedgewood

You may have noticed construction equipment at the club.  American Water is replacing pipes near the club and has asked us to use the grass area adjacent to our parking lot for use of equipment and supplies during the project.

In return, they have agreed to the following:

  1. They will use the area starting by the end of this week (about  1/5/17) and will have whatever area they use restored and hydro-seeded by 5/5/2017 at the latest.
  2. They will topsoil / Grade / and Hydro-seed the entire area to a minimum of current existing conditions.
  3. They will construct a trash enclosure to house our dumpsters and recycling.

Please let the board know if you have any questions.